🔄 Repeat orders speak for themselves.

posted July, 2026

Metcraft recently supplied this 8,750L bulk tank for the second phase of a life sciences development in London.

Manufactured to meet the client’s specific requirements, the tank is complete with a 10 bar gear pump duty/standby duplex pump set, pressure relief bypass and an offset fill point. The unit was also fully wired by our in-house electrical team prior to delivery.

This is the second tank of this design that we have supplied for the project, providing continuity across multiple phases of the development and ensuring the client receives a solution that is already proven to meet the site’s operational requirements.

From fabrication and assembly through to electrical installation and testing, all work was completed by the Metcraft team before the unit left our facility.

Whether you require a standard fuel storage tank or a fully integrated, project-specific solution, our team can work with you to deliver a system tailored to your requirements.

get in touch

If you have any questions about our services, or how we can help you, please feel free to contact us.