From CAD to completion – and now loaded for delivery. 🚛

posted July, 2026

This 64,000L usable bunded fuel tank has been designed and manufactured by Metcraft for a well-known UK prison, providing a complete, fully integrated fuel storage and transfer solution.

Built to BS799 Type J Part 5, the tank has been engineered as a pre-wired, plug-and-play system to reduce installation work on site and provide the client with a solution ready for straightforward connection and commissioning.

The specification includes:

⚙️ Metcraft 100K fuel polishing unit
⚙️ Metcraft Duplex Model 50 fuel transfer pump set
⚙️ Motorised valve outlet
⚙️ Two pressure relief bypasses
⚙️ In-line Y-strainer to protect the pumps during operation
⚙️ OLE C2020 digital tank contents gauge
⚙️ Three-channel tank alarm
⚙️ Integrated leak detection

The pump set and fuel polisher control panels, gauges and alarm equipment are all housed within the tank’s roller shutter end compartment, with the complete system wired by our in-house electrical team.

From the initial CAD model through to fabrication, electrical integration and final dispatch, this project demonstrates the complete fuel storage solutions available from Metcraft.

get in touch

If you have any questions about our services, or how we can help you, please feel free to contact us.